If the machine is to be sold in the USA or Canada, it is the panel that decides whether it may be put into operation. We design and build to UL 508A from the first revision — so component selection, labelling and documentation do not have to be redone once the panel is standing on the quay.

UL requirements belong in the drawings, not in the panel afterwards

The difference between a European and an American panel is not how well it is built. It is which components are allowed in it, how much space there must be between them, what the labels say, and which documentation comes with it. If this is only discovered once the panel is assembled, the fix is a rebuild — not a drawing change.

That is why we build the UL requirements into the design from the first revision. Components are selected within what UL 508A permits, spacing and layout are drawn to the standard in 3D before a single rail is cut, and labelling and documentation are produced in English from the start. You approve the drawing package before production begins, as with all our other panels.

The panel is built and tested in our own workshop to the approved package. Changes made in the workshop are written back into the drawing package as new revisions, so the as-built documentation matches the panel that is shipped — terminal by terminal. That is the set your customer and their inspector need to be able to work from.

Is your plant going to the USA or Canada?

Send us the wiring diagrams or the requirement specification, and we will tell you what needs to change for the panel to meet UL 508A — and what that means for the enclosure and the delivery time. Normally within 1 working day.