Panels, installation and control for charging infrastructure — built as a series, documented per site and ready to be repeated at the next location.
Rolling out charging infrastructure means many identical installations at many addresses. That places different demands than a one-off project: identical panels, identical documentation and an installation that can be repeated with the same quality at every location.
The solution is defined once. The panel is series-produced from the approved design, connection and commissioning follow the same test plan at every address, and the documentation is handed over per site, so you can retrieve the individual installation later.
Power supply and monitoring are built into the design from the start, and the spare parts are the same at all sites — so service can be planned as a whole rather than address by address.
We create momentum in the roll-out with panels and installation that are standardised once and repeated at every location — the same quality, whatever the address.
Three building blocks of a roll-out that can be repeated — the expertise pages show how.
Distribution boards and control panels for charging points and charging parks — series-produced from one approved drawing package.
Installation, connection and commissioning on site — the same test plan, every time.
Control systems and software for operating and monitoring the charging infrastructure.
Tell us about the roll-out: number of locations, power requirements and schedule — and we'll get back to you with how we would set up the delivery. Normally within 1 working day.